Woolwich Dockyard Woolwich Dockyard Boosting Water Installed boosted water sets with break tanks to 3 blocks
Woolwich Dockyard Woolwich Dockyard Plant Room Renewal of aging district heating system supplying 332 properties. Installation of 6 boiler rooms.Installation of distribution pipe work.
Owen Waters House Owen Waters House, Ilford Plant Room Installation of new plant room.5 pipe distribution pipe work.Internal rad circuits within 88 properties over the two blocks.Use of Aquatherm plastic welded pipe.
Wordsworth House Wordsworth House, Greenwich Plant Room Installation of roof top 805KW plant room.Use of temporary boilers and pumps to provide minimum disruption to the 120 properties.